Teams of experts were assembled to plan and implement every detail of ‘Charleston Regained’. Architects, structural engineers, quantity surveyors, mechanical and electrical engineers, electricians, builders and the Charleston Trust’s curatorial staff and conservators worked together to protect
Charleston’s fragile interiors from the impact of essential building work. As soon as Charleston closed for the winter the collection was packed up and moved into store. The Trust’s conservators helped with the removal of awkward or unstable pieces and they worked closely with the contractors, advising on the best protection for decorated
walls and fireplaces. From November 2003 until March 2004 Charleston was a building site.

 

 

Charleston

Picture captions from left to right:

Main picture - Re-wiring the Garden Room.
2. A meeting in the Portacabin.
3. The packing and removal team.
4. Examining a painting by Duncan Grant before it is returned to the Tate for the winter.
5. Carefully carrying Vanessa Bell’s self portrait to it’s winter store.
6. The door from Clive Bell’s Study, painted by Duncan Grant, goes into store.
7. The contents of the Green Bathroom are packed away.
8. Tubes of oil paint are carefully bagged for storage.
9. Books are removed from the shelves in Clive Bell’s Study.
10. The rag rug from Maynard Keynes’s Bedroom is wrapped in acid free tissue paper and a cotton cover.
11. Curtains are removed from the Studio.
12. The Study of Tony Asserati by Duncan Grant is prepared to be sent out on loan for the winter.
13. The plaster cast of a statue of a Chinese god is carefully removed from the Studio to undergo conservation.
14. Labels identify each piece of furniture.
15. A chair in the studio awaiting removal.
16. The cherry wood cabinet from Clive Bell’s Study is taken from the house.
17. The sofa is moved from the Garden Room.
18. The Stephen Tomlin sculpture of Virginia Woolf is highlighted for priority in case of an emergency whilst in store.
19. Paintings in their gallery store.
20. Painted furniture being stored in the Tea Room on specially constructed shelving.
21. Objects from the Dining Room and Kitchen in store.
22. Installing protection to the walls and floor in the studio.
23. The studio fully protected.
24. The studio fully protected.
25. Rewiring in Vanessa Bell's Studio.
26. Re-pointing loose brickwork in the Bat room.
27. Protection in the Library.
28. The builders

 

   